FOR SAME AMOUNT OF RAINFALL & EQUAL CATCHMENT AREA THEN
WHERE RUN OFF WILL BE HIGHEST?
Answer Posted / ruchi
runoff will be highest where the permeability of the soil
is minimum( coef of pearm. 'C' will be maximum).
| Is This Answer Correct ? | 12 Yes | 0 No |
Post New Answer View All Answers
I used Etabs software to analyse a high-rise building. And I want to use templated UBC-codes inside to calculate the Seismic load. My question is: whether or not I have to control the seismic load by base shear load which is manual calculation? (just for more clarification: I can control this by input the scale factor into Eartquake definition in Etabs) I would highly appreciate your answer.
Give list of building construction equipment & explain about them in brief. How much is output of JCB, POCLAIN, Steel cutting & bending machine, material hoist, tower crane?
asubmerged weir is one in which the water level on the down stream side of the weir is just at the crest level below the crest level above the crest level at stamp elevation as water surface on upstream
why we use for testing of compression strength concrete the size of specimen 150x150x150. why we are not using another dimension like 100x150x100 uneven dimension.
What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?
within an emergency scenario what are the safe systems of work a coss can setup as part of is duties
How much time Required for PPR pipe network testing
sir please send me campus placement questions in civil engineering
How to estimate the shuttering material requirement for a slab and beam and shear wall..? Please send thumbrule to estimate material required ( Plywood, Ms plates, runners, acrospans, jacks)
What are the different approaches in designing the floors of the service reservoirs?
Need help in designing a degasser tower for 2m3/hr DM plant, also send me the formulae used
explain what do you mean by the property development.
Explain what is the difference between built area and super built up area?
20 mpa what is the quantity of cement sand and aggregate in one cubic meter of pcc non rainforcement concreate kindly answer including formaula thanks
What is labor and material payment bond?