How can we calculate one operator can 2 to 3 machine?
Is it any calculation for this.
Answer Posted / engr. ansari
The calculation is dependent on the operations cycle times,
if you are doing line balancing on the basis of
machine/operations cycle time check the under utilize OR
excessive utilize work content and distribute it
accordingly, if 2~3 operations have very less time in
sequance with the next operation, one operator can perform
on 2 or 3 machines to make the more efficent line.
Is This Answer Correct ? | 1 Yes | 1 No |
Post New Answer View All Answers
On what bases time study methods can be calculated?
how can we choose the controller of CNC bending machine?and how can we know the nomber of the machine axis?
i have one air blow heater , coiled heater is in side hollow ceramic tube and passing the air and other end hot air is going out, to control the hot air where i should fix up a THERMOCOUPLE on the heater or on the out let of hot air terminal which is the best way
why data registers are needed in PLC ?
How we install and terminate the wire of pressure transmitter and temprature transmitter. Give full explanation.
Difference between chopper and dbr?
what is difference between an encoder & resolver?
How three wire proximity can be used in place of two wire proximity?
What is refrigeration cycle of HVAC .
why we use log files in QTP?
I have 200kg weight cylinder,I want to rotate,but i don't know what is torque of cylinder and what's size of motor for rotate the cylinder.i want to know calculations find out torque of cylinder.
We will import machihery. how we will take input
What is the specification of transformer?
how could you change gas line control valve to liquid line valve?
what is load capacity of 11 cm cylinder bor 100kg. pressor?