How can we calculate one operator can 2 to 3 machine?
Is it any calculation for this.

Answer Posted / engr. ansari

The calculation is dependent on the operations cycle times,
if you are doing line balancing on the basis of
machine/operations cycle time check the under utilize OR
excessive utilize work content and distribute it
accordingly, if 2~3 operations have very less time in
sequance with the next operation, one operator can perform
on 2 or 3 machines to make the more efficent line.

Is This Answer Correct ?    1 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

On what bases time study methods can be calculated?

597


how can we choose the controller of CNC bending machine?and how can we know the nomber of the machine axis?

1964


i have one air blow heater , coiled heater is in side hollow ceramic tube and passing the air and other end hot air is going out, to control the hot air where i should fix up a THERMOCOUPLE on the heater or on the out let of hot air terminal which is the best way

1641


why data registers are needed in PLC ?

2212


How we install and terminate the wire of pressure transmitter and temprature transmitter. Give full explanation.

1000






Difference between chopper and dbr?

654


what is difference between an encoder & resolver?

2448


How three wire proximity can be used in place of two wire proximity?

588


What is refrigeration cycle of HVAC .

1008


why we use log files in QTP?

1854


I have 200kg weight cylinder,I want to rotate,but i don't know what is torque of cylinder and what's size of motor for rotate the cylinder.i want to know calculations find out torque of cylinder.

2163


We will import machihery. how we will take input

1246


What is the specification of transformer?

608


how could you change gas line control valve to liquid line valve?

1788


what is load capacity of 11 cm cylinder bor 100kg. pressor?

1801