Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

What is the direction of rotation of blades in a table fan
and in a ceiling fan ?

Answer Posted / bk

Table Fan's blade rotate : Clock Wise
Ceiling Fan's blade rotate: Anti Clock wise

Is This Answer Correct ?    54 Yes 11 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

calculate external resistance values to add to the rotor of a slip ring induction motor. STATOR- 415 V, 3 phase delta, 1100 A, 50 Hz, 1490 rpm, pf 0,86 ROTOR - 660 V, 590 A, 50 Hz. STATOR current at each steps STEP1-600A,STEP2- 800A,STEP3-1000A,STEP4-1100A.

3571


technically, what is the reason behind starting the motor star the delta connection .. and what other ways to do this rather than using " star-delta transformer"

1994


in control panel, how can i measuring the distance between one bus bar to another bus bar. then now only for bus bar. in mpcb and contactor also. that means one mpcb to another mpcb how much distance? how can i calculate that.

2381


When distance between two pulleys is not fixed, the tension of belt is adjusted by a) driver shaft b) driven shaft c) adjustment screw d) belt

3030


Please clarify, 1. Is it required to lay two runs of GI wire along with Armoured LT cable if it is laid between one big mains (63Amps TPN SDF) to small main (32A TPN SDF) with proper glanding termination? 2. If the armoured cable with proper glanding is laid from DB to CNC machine, is it required to run two runs of body earthing to the Machine from DB? 3.If the armoured cable with proper glanding is laid from Substation to Hangar, distance is approx. 100 mtrs, is it required to do earthing at shop area though the primary termination at substation is earthed through gland.

2031


What is an 86-P or an 86-A trip

2080


What is the function of NER and NET?

2449


how the works electronic energy meter?

2169


How can I calculate ISF of current transformer?

3643


Haw to check conductivity of budbar

1804


what is the relation between size of the anteena and wavelenghth of radiated wave

2183


At what factor resistance r of a conductor depends?

1122


Q: How to calculate Transformer losses , tell us by Formula.

2077


importance of reactive power management

2033


Is neutral transformer can be called as control transformer?

1980