Answer Posted / sakthi
THIS IS THE FINAL BASE COARSE OF TOTAL STRUCTURE,AND
TRANSFERS THE LOAD UNIFORMLY TO THE GROUND FROM THE ABOVE
STRUCTURE.
| Is This Answer Correct ? | 6 Yes | 6 No |
Post New Answer View All Answers
How is make concrete cube?
why we use for testing of compression strength concrete the size of specimen 150x150x150. why we are not using another dimension like 100x150x100 uneven dimension.
Please let me know about answer for my Question as "What is the maximum wastage allowable of HYSD Steel in any Bridge project as per Code and Code reference also ?
100mm block work 64 bags of cement used 150mm block work 286 bags of cement used 200mm block work 20 bags of cement used patly work (M15) 293 bags of cement used mortar ratio is 1:5 how to calculate volume of sand in cum & no. of bags
Define What is passive earth pressure ?
Why are pull-out tests performed for soil nails?
what is anchorage length,lap length and (dont remember the last one)
why we are useing plastic under the lean concrete?and whts the advantage?
in staad ,why we realease a moment of a member ? what is affect if we realease a moment
What is the Maximum %age of Steel in columns and beams ?
Dear Sir What is the Contraction joint for base Slab
How to do base isolation for RC framed structure using ETABS software?
Questions related to civil.engg in company
States some of the tool bars used in cad?
What is difference between code and standard and specification?