how to calculate steel columns beams and slab please give
me brief calculation
Answer Posted / amit mehta
Generally we assume 1 to 5 percentage steel in columns of
concrete.1 to 2 percent in beams,0.7 to 1% in slabs and .5
to .8% in footings.
if concrete is 100 cum.
than in column if we take 1.5% steel it will be 1.5 cum steel.
1.5x7850kg/cm3(density of steel.)
quantity of steel determined.
| Is This Answer Correct ? | 189 Yes | 44 No |
Post New Answer View All Answers
IN Compression testing machine 1division =10KN ,then what is compressive strength of 100*100 mm cubes at a load of 320 KN
how much deduction will be in 32 mm dia HYSD steel bar for 45 and 90 degree bend
What is the nature of duties & responsibilites senior civil engineer ?what is self confident & satisfaction should be a senior civil engineer?
Which is the best book for building construction?
What is 1/8 on the architect ruler denotes?
hoe much fine & sourse agregate required for concrete mix of 1: 1.5:3 by volume in Cu.Ft
for Precast foundation howmany days required we can shift the foundation with american Standards i need reference with section any body can help
Does brick grows bigger every year?
What applicable rate of wct in bihar
five benefits of using standard terminology in the measurement process
contractor receive 100 MT steel.after compliting the work the contractor refund 90 MT steel.How reconsilation of steel done?
What is the difference between Fe 500, Fe 500 D and Fe 515.
how do you calaculate the total steel quantity of an rcc building using thumb rule?
Method of findingthe dry ingredient quantity of 1 m3 concrete. what is the difference between static and dynamic induced emf? Testing charges bill given for Rs. 32,000/- but not added service tax in this bill. So, How much TDS will be deduct
How much is the cover for slab?