Answer Posted / mansi
I really appreciate the intial salary as a token of my
joining the firm. But i m really sure of the positive
salary changes by the firm itself on account of my efforts
with the passage of time.
Is This Answer Correct ? | 2 Yes | 1 No |
Post New Answer View All Answers
What is the amount of work done by a carpenter, bar Bender and plaster Mason in interior and exterior plaster
) Design a gussetted base for a column section consisting of one sc 250 with two cover plates 300 x 25 mm carrying an axial load of 2500 KN. The S.B.C. of soil is 250 KN/m2 and the permissible bearing pressure on concrete is 4000 KN.
how to create our resume?
Analyze the rate for 1st class brick work in superstructure with 1:6 cement sand mortar. Consider 1000 cu.ft quantity and work out the rate per cu.ft
How to calculate Acctually Brickwork Quantity in Honey Comb Brick in circular Soak Pit
Define line type?
What are the ingredients of pre-stressed concrete?
Describe the role of independent Quantity surveyor?
Detection of a beam & a girder areββββ
What are the different types of foundation?
how to calculate detail quantity of bricks and mortar for 500 cu.ft masonry work. consider wall thickness 9 inches
how much quantity of 1.5" nails and 2.5" nails are required for conventional formwork shuttering?
hi guys what happens if you are absent for a supplymentry exam?
What Reinforcements Are Used In The Process Of Prestressing?
asubmerged weir is one in which the water level on the down stream side of the weir is just at the crest level below the crest level above the crest level at stamp elevation as water surface on upstream