Answer Posted / chowdary s
By using POSDBF Cmmand through CL PGM, can do
Thanks
CHOWDARY S
| Is This Answer Correct ? | 2 Yes | 4 No |
Post New Answer View All Answers
What is the difference between copybooks and subprocedures in as400?
what is file information data structure?
What is the diff bw PF/LF Name and their Record format name? what is restriction in record format then file name?
1. If there are two programs using same file and 2 users are using the file at the same time and what can be done to allow them both to access? 2. How can remove lock from the file for accessing it by both users?
What is difference between bind by copy and bind by reference?
can any one help in hawkeye and turnover or any change management system plzzzzz or send the documents to my mail id :gvsp.as4@gmail.com
How to create a login screen using a command instead of display file.... intention is to get a password field on a command..... how do you achieve this...
what is the procedure and explain about real time scenario.
what was the robotech rpg?
how do I declare a minor?
Program to read marks of 10 students for 4 subjects and compute and display total marks and status of each student in rpg
how can I tell when to replace the array?
Q:Hi all,i want accurate answer with code using in built functions.please sent me code as soon as posible. I have program nmed PGM1 which '' RETRIEVE Current production date''should correctly default the production date for the user who is issuing raw materials to the manufacturing.The production date can be different from the celendra date. However, the program does not make the correct adjustment for all manufacturing plants. there is a parameter which determines the production start time e.g. 07:00 if the system time precedes this,the program subtracts one from the celendra day.This work fine when the celendar day starts after production day as it does in England,the system should be adding one to the celendar day during the overlap. unfortunately the program was desined to assumed the celendar day always starts before the production day. Change required in the program: Change the PROGRAM PGM1 to use the new parrameter to decide whether to add or subtract 1 from the celendar day when determining the production date.
How to call one program from another program in RPG? please help me with the code
if there is a module object , how to find the program object for this module object.Assume the module object name and program object name is not same.