Answer Posted / ramamurthy
Piles are like Columns driven into ground to trasfer load
of super struture to Foundation pile foundation is
neccesary when SBC of soil is less and struture to take
more load. 2 or more than 2 pileas driven over that pile
cap just like footing is going to rest over it and columns
will inbuilt in pile cap for super struture.
| Is This Answer Correct ? | 5 Yes | 1 No |
Post New Answer View All Answers
Design a cantilever type retaining wall to retain sand for 4m above the ground. The sand fall slopes at the rate of 1 vertical to 2 horizontal. The weight of sand is 18000 N/m3, the angle of repose being 30. The safe bearing capacity of the soil is 200 kn/m2 at 1/25m below the ground level. Use m 15 concrete mix.
hai, kindly send anyone for output workers format details for construction project in foundation to finishing.
What is the largest concrete dam in the world?
Does brick grows bigger every year?
whou haat goals do you have in your career
Explain major difference between auto level and dumpy level?
I was once rejected for US visa in early August. But now I'm going again for interview next week. What are the chances that I will faced the same VO????
How do we test on design and style in a software?
Can compresive strength test for concrete at 1 day age possible to carry out? If yes, which IS code describes the procedure for such testing?
mix design procedure for 1:6 cement mortar
Cut Linten (RCC-1:2:4)on 10" wall - what should be the width and hight of cut Linten? Secondly, 1 X 1.6 foot,4" thick window sun/rain shed (Chajja)should consume steel,Cement, sand and Stone chips?
When column of building is abutting the boundary line,then suitable footing advised is
How much material will consume for following specification water tank (9*7.5*6 feet)?
in 100 cft = 1350 bricks in 100 cft = ? bloks
rate analysis hiring of generator 62.5 KVA