Answer Posted / anil kumar vaddi
Gantry girder is a concrete or steel member of short
cantilever span to take heavy loads. (such as crane, rails
etc)
| Is This Answer Correct ? | 55 Yes | 19 No |
Post New Answer View All Answers
WHERE CAN I GET THE PREVIOUS QUESTION PAPERS OF APGENCO FOR THE THE POST OF Tr.ASSISTANT ENGINEER(CIVIL)
sir when can we expect the AEE results and when will be the interviews sheduled please guide us in this regard thanking you
Rate analysis of 150mm, 100mm, & 230mm thk BBM work
what is the design procedure for building
Stringer How many cm goes to landind
Please tell me the quantity of cement, sand, flyash, foaming agent required for 1 cubic meter of cellular lightweight concrete blocks. also , is there any admixtures required for the CLC blocks production.
Define What is rigging?
How much of the strength of concrete comes from post- production curing?
What is the mix propotion of M10,M15,M20,M25,M30,M40,M50.M60 cement content,aggrigate,sand and water ratio.
how to calculate rate analysys of 1:6 plastering 10 sq m
I am called for interview from north east power plant .so, I need some interview question which may help me.
what is the difference between replacement of cement by groundnut shell ash
What is the difference between engineering stress and true stress?
In the different classes or grades of concrete, what is the difference between C20, M20 B20. what are the letters C, M, and B stands for.
Before casting a basement roof slab which is connected with retaining wall surcharge load (i.e. sand or earth filling) outside the retaining wall is prohibited because of––