I am an electrical contractor in noida, I am registereg in
noida vat. i got a contract in Delhi State, my party told
me that we shall deduct WCT @4% & reimburse Service tax all
in composite scheme.
Now Problem is this,
1 Can i able to purchase outside the delhi?
2 Can i produce a c form to our vendors?
3 What is limitation of purchase from outside the Delhi?
4 What % of tax Govt will levied upon me?
5 How can i take credit of tax paid upon purchase made by
us.
So, like these type questions i have in my mind if any
person know the right answer please write to
sksproj@gmail.com or contact me on - 8010076534 /
9212758177 / 9718378190.
Thanks with Best Regards,
S.K.Saxena
Answer Posted / agd
contact TAX CONSULTANT.......simple
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
As i want some model question paper in basic computer science and history please send me immediately sir
i have interview in Pepsi company what type of question will ask please send the question and answeer
How is operate breaker failure scheme in substation
boiler is running in rankine cycle and deisel generator is....?
What is an order of a system.
How isolater function when installed inelectrical 440V wiring
Please clarify, 1. Is it required to lay two runs of GI wire along with Armoured LT cable if it is laid between one big mains (63Amps TPN SDF) to small main (32A TPN SDF) with proper glanding termination? 2. If the armoured cable with proper glanding is laid from DB to CNC machine, is it required to run two runs of body earthing to the Machine from DB? 3.If the armoured cable with proper glanding is laid from Substation to Hangar, distance is approx. 100 mtrs, is it required to do earthing at shop area though the primary termination at substation is earthed through gland.
what is difference between 2 pole structure and 4 pole structure in transformer yard
Both generator parallel condition shared load equally but one genrator taking ampere more than the other what are all the causes to make like this
what's the difference between abs/inc encoders. apart from the position remembrance what are all the other differences. and what's mean by grey code.
Dear All, I am new in construction company , my boss ask a question at time of interview , If we have 60MW generation and Single Power Transformer step-up we have. if CMR 50/60MVA , ONAN, ONAF respectively , is it sufficient or not ? for that much power to transfer,
What is the rating of circuit breaker needed for 300 KVA load in 33 KV supply line in a transformer of 33 KV / 415 Volt ?
why we used dc supply for field in dg set
What are the advantages of using distance protection schemes as opposed to normal overcurrent/ earth fault protection on high voltage feeders.
What is difference between Harmonic and Non harmonic Capacitor Bank?