Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

why are you interested in joining in core company instead
of joing in software company

Answer Posted / devaa

i am in electronic communication dept.so i have more idea in
this dept. i think core company is best and easy for in this
field .software is not enhance doesn't creat the new ideas
and no jop satisfaction.

Is This Answer Correct ?    3 Yes 7 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is the need of earthing transformer for delta side of a transformer. (Think of a line section between a star/delta transformer at a grid substation and delta/star transformer at a village. An earthing transformer is there at the delta side of the star/delta transformer at grid substation). As there are no ground reference there will not be fault current if a one phase is grounded. Further L-L phase will be sensed by the primary side of star/delta transformer as a L-G fault. So why an earthing transformer is required at delta side

1466


What is meant by vector group

2551


sir iam a 3rd yr eee student.no core company comes for recruitment to our college.my aim is to be placed in l and t.tell me the procedures.

2018


I need the recommended size for a 3 phase transformer at 13.8 KV Primary and connected loads of 3000 kVA at 4200 volts and 2375 kVA @ 480 volts AC.

2035


please send 5yearje solved papers on my email himmatsinghnathawat@gmail.com

1931


how 650 volts creates? where is use?

2218


what is ground fault in ACB?

2101


how to choose cable size with respect to load? how to convert cable size in mm2 to sq.mm?

6003


placement paper samples of mspl company

1946


induction 3 phase motor terminal connection

2674


I COMPLITED MY B.TECH AND 10TH CLASS WITH 70%MARKS BUT 12TH CLASS 55%MARKS..CAN I GET INDIAN RAILWAY RECUREMENT EXAMINATION?

2188


a governer in an Ic engine controls the

1199


how to calculate the capacitor to maintain power factor?

2170


ELECTRICAL DRIVES: can a motor load system with passive load torque can have equilibrium speed in second quadrant

6327


Name the test signals used in control system

1292