why are you interested in joining in core company instead
of joing in software company
Answer Posted / devaa
i am in electronic communication dept.so i have more idea in
this dept. i think core company is best and easy for in this
field .software is not enhance doesn't creat the new ideas
and no jop satisfaction.
| Is This Answer Correct ? | 3 Yes | 7 No |
Post New Answer View All Answers
What is the need of earthing transformer for delta side of a transformer. (Think of a line section between a star/delta transformer at a grid substation and delta/star transformer at a village. An earthing transformer is there at the delta side of the star/delta transformer at grid substation). As there are no ground reference there will not be fault current if a one phase is grounded. Further L-L phase will be sensed by the primary side of star/delta transformer as a L-G fault. So why an earthing transformer is required at delta side
What is meant by vector group
sir iam a 3rd yr eee student.no core company comes for recruitment to our college.my aim is to be placed in l and t.tell me the procedures.
I need the recommended size for a 3 phase transformer at 13.8 KV Primary and connected loads of 3000 kVA at 4200 volts and 2375 kVA @ 480 volts AC.
please send 5yearje solved papers on my email himmatsinghnathawat@gmail.com
how 650 volts creates? where is use?
what is ground fault in ACB?
how to choose cable size with respect to load? how to convert cable size in mm2 to sq.mm?
placement paper samples of mspl company
induction 3 phase motor terminal connection
I COMPLITED MY B.TECH AND 10TH CLASS WITH 70%MARKS BUT 12TH CLASS 55%MARKS..CAN I GET INDIAN RAILWAY RECUREMENT EXAMINATION?
a governer in an Ic engine controls the
how to calculate the capacitor to maintain power factor?
ELECTRICAL DRIVES: can a motor load system with passive load torque can have equilibrium speed in second quadrant
Name the test signals used in control system