Answer Posted / amarnath
OD means the Operating Device in a RMU(Ring Main Unit) and
VL means Vertical Lift in the RMU.
| Is This Answer Correct ? | 50 Yes | 5 No |
Post New Answer View All Answers
how to avoid Saturation in C.T?
ITI r/tv trade APPLY (J.T.O VACANCEY) ALSO INCLUD AITT ELECTRONIC,WRITEEN XAM DONE 23.03.10 BUT NO RESPONCE WHY ANATHER ID gopal_gh007@rediffmail.com
how u select control transformer for a mccb panels or any panels?for expample we hav 440 volts maim supply and control volts is 230v?
why magnetising curve not start with zero voltage?
what is the difference between directional & non directional earth fault with example please explain.
sugest any typical project ?
What is the basic rule for block diagram reduction technique?
I PURCHASED A DEISEL GENARATOR SET OF AVR TYPE& RATING 125KVA BUT SOME TIMES THE OUTPUT VOLTAGE IS FLUCTUATING WHAT ARE THE PROBABLE REASONS GIVE ME
In between UPS out going changer over switch and ups raising main input, both side cable gland producing heat but the cable doesn't get heat,Why?
I have iti elec, 1st aid, and 5 yrs experience in 7.5 mw power plant. Am i eligeble for 11kv license in telangana state..when, how to apply for that.?
What is the function of auadag in a cro?
define reflection method?
How convergengr of nr method is not dependent on selection of slack bus and how gauss siedel method depends?
What is the need of earthing transformer for delta side of a transformer. (Think of a line section between a star/delta transformer at a grid substation and delta/star transformer at a village. An earthing transformer is there at the delta side of the star/delta transformer at grid substation). As there are no ground reference there will not be fault current if a one phase is grounded. Further L-L phase will be sensed by the primary side of star/delta transformer as a L-G fault. So why an earthing transformer is required at delta side
A 11KV, 1200 A breaker combination fixed in a cubicle for HT motor.Is normally for 11 KV motor fuse is using? if Yes, What range fuse is required?