In which context do you use bills of material?
[ ] Material Requirements Planning
[ ] Execute Production
[ ] Goods Movements (to Help Data Entry)
[ ] Product Costing
[ ] Development/Engineering/Design
[ ] Documentation
[ ] Others
Answer Posted / sriram
1.Material Requirements Planning
2.Execute Production
3.Product Costing
4.Documentation
5.Development/Engineering/Design
| Is This Answer Correct ? | 2 Yes | 2 No |
Post New Answer View All Answers
In implementation stage tell some standard scenario before AS-Is & TO-BE
What is the use of mrp pp evaluations?
how many times pcc can run for one material?
Explain what is “work center” in sap pp and what is the use of data in work centers?
List out the basic procedure for dispatching operations in capacity leveling?
What is the planning horizon?
What is a ‘bom’?
Integration between PP and MM Module.
Scheduling times can be defined in the material master record by?
How is the processing time calculated in a wc when both labor, machine categories exist?
What is finite scheduling?
What are the MRP master data?
How does sap know that an operation has components as indicated by the component allocation indicator?
Explain what is plm (product lifecycle management) in sap pp and what is the use?
a company needs 12 standard values. how it can be maintained?