In which context do you use bills of material?
[ ] Material Requirements Planning
[ ] Execute Production
[ ] Goods Movements (to Help Data Entry)
[ ] Product Costing
[ ] Development/Engineering/Design
[ ] Documentation
[ ] Others
Answer Posted / sriram
1.Material Requirements Planning
2.Execute Production
3.Product Costing
4.Documentation
5.Development/Engineering/Design
| Is This Answer Correct ? | 2 Yes | 2 No |
Post New Answer View All Answers
What are the reports generated in product cost controlling information system?
How can you create production order without routing and BoM?
Which BOM item category you have used?
What is sap pp?
Steps to configure Production order type.
Explain the gaps and the steps involved in them.
what do you mean by planning time horizon
What is finite scheduling?
Splitting of production order & product version
What are traffic lights in mrp?
What is meant by payscale structure?
How can you get planned orders scheduled so that you can do capacity leveling ?
If there are some errors in goods movements, and less stock of material consumed, how can we solve that problem in sap ?
We want to report on several status combinations like each order that has status ‘not deleted’ and ‘not technically completed’. What set up is required?
What is recursive BOM