Concrete Mix designs for M15,M20,M25,M30 and M35

Answer Posted / navin morwal

M-15 = 3.5 N/MM2, M-25 and M-20 = 4 N/MM2, M-30 and M-35
=5NMM2 THANKS.

Is This Answer Correct ?    67 Yes 103 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is hydrostatic paradox?

1719


pls give me some basic informations in construction of a structure?

1618


Differentiate first angle & third angle projection?

676


Define angular dimension?

687


What is the quantity of cement used for stone pitching work of 100sqm 225mm thick and cement mortar of 1:6? And how?

4670






how to calculate the weight of concrete

1041


What is the formula for figuring out how many gallons of water are in a pipe by the foot?

665


calculate the quantity of cement ,sand,bars and aggregate used for 28*4 ft with 4 inch (125mm) thick

1374


What Are The Steps Involved In The Concreting Process, Explain?

840


What is labor and material payment bond?

645


Difference between pre-tensioning and post-tensioning.

698


Power grids in two adjacent states(A&B) are interconnected. Can power grid in state A can be represented by Thevenin Equivalent Circuit. If not explain Why?

1894


What is binding spacing of the rebars at lapping zones.

625


What is the material consumption- cement,sand,tiles etc for Toilet dado?

7065


Explain soil analysis?

669