what u mean by speed control in turbin? how it was working?
Answer Posted / banerjeenandan
As the Generator output frequency remains constant usually
50Hz, so we have to control the speed of the turbine in
constant speed. Govorner takes the signal from Magnetic
Pickup Unit (MPU) and operates the govorning valve so that
the turbine rotates in constant speed.
The magnetic pickup unit is mounted on turbine front, facing
the gears of the gear wheel. Generally there remains 2 or 3
nos of sensors which measure the speed simultaneously. As
the turbine rotor rotates, the number of gear teeth cutting
by the sensor increases. This is counted at the sensor
itself. According to this the sensor sends an mA signal to
the govorner. And thus with respect to this, the govorner
takes action to open or close the Govorning valve to
regulate the flow of steam entering into turbine.
| Is This Answer Correct ? | 20 Yes | 0 No |
Post New Answer View All Answers
Any body have know try work calculation ???
Who to difference between analog in & analog out in dcs?
how to calibrate steam control valve in steam turbine
Somebody can explain me about >Critical Loops, calibrations, ESD critical Loop checks, Logic Diagram / Cause & Effect checks for ESD loops,
What are different types of cable?
Sir , i have completed my M.Sc In Instrumentation and presently working in Maintenance department 3 yrs Exp , is there is any possible for work in offshore ..
Please any one can provide latest aptitude test,technical test and interview questions for tata consulting engineering (TCE) i need it asap thanks in advance
What is three element in drum level?
What is force balance principle?
I want to buy a seal kit of a pneumatic power cylinder.But I don't know it's specification.So please help me to know its specification.
How can i test procedure grounding for CAT-7 cable? Or How can we test procedure CAT-7 Cable Electrically safe?
I have a Control VAlve having size of 2 ".Only the known parameter is Pressure drop . Its 2 Kg. Then How to calculate control valve sizing means Cv.
Why mixer nd grinder Is example of constant torque load not variable torque load ???
what is the difference between active & reactive power?
what is interface level and how it is calibrate?