Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

how many types of hydraulic coefficints and their values

Answer Posted / yojana pudale

Tere are 3 hydraulic coefficents namely, Cd(Coeff. of
discharge), Cc(coeff. of contraction),Cv.
Cd- 0.91-0.95
Cc- 0.95-0.98
Cv= Cc*Cd

Is This Answer Correct ?    6 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How many types of slabs are there & how to design it?

1284


Define aligned dimension?

1116


insted of bentonite we can use any alternate material in piling ?

2156


Calculate the maximum allowable speed on a horizontal curve of radius 350m if the maximum allowable values of the lateral coefficient of friction are 0.14 and the rate of superelevation is 0.08.

2511


What are wooden shingles?

1230


States some of the commonly used commands in cad software’s?

1205


what is pile and deam foundation

2339


Which code specifies the specification ofthe construction joints to be provided in the raft slab of a basement which is 6 m deep.what should bethe detail of such a joint?

2465


What is the standard specification of MOR and Water Absorption of Homogenous Ceramic Floor Tiles?

2224


Explain what is structural frames or systems?

1138


What is the different type of slump test indications?

1125


What is difference between code and standard and specification?

2371


What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?

2853


What is absolute pressure? How absolute pressure is calculated?

1132


Forces in a Shear Wall are in plane or out of plane ?

1130