Answer Posted / imteyaz hussain
Dr.Karl Terzaghi
| Is This Answer Correct ? | 49 Yes | 1 No |
Post New Answer View All Answers
How much time Required for PPR pipe network testing
column at edge of a framed structure is uniaxial or biaxial. and is an interior column is biaxial
Specific gravity of cement?
Whats the meanig of ,'K' VALUE in the case of soil.....
Define What glue is least sticky?
construction workers how much time take one work or qty
How many % we consider for lap for reinforcement for estimates
What is the cost difference between site mix and ready mix concrete per cubic meter
In few lines, please be elaborative on extras and talents that make you a potential candidate for the post:
hi, i am appearing in HPCL(CIVIL ENGG.)exam. plz send me placement paper of this exam if u are having
How much area, in square meters, will one liter of paint cover if it is brushed out to uniform thickness of 100 microns?
Design a cantilever slab to carry a live load of 2000 N/m2. The overhang of the slab is 1.20m. b) A slab over a room is 4.75m x 4.75m. The edges of the slab are simply supported and the corners are not held down. The live load an the slab is 300 Kg/m2. The slab has a bearing of 15cm. On the supporting walls. Design the slab as per Rankine - Grashoff theory. Assume weight of R.C.C. = 2400 Kg/m2.
How to calculate the cement plastering for circular and rectangular water storage tanks and how to calculate the area of circular and rectangular floor?? Please help me
What is the purpose of the gap in the road on this bridge?
Define What is the origin of name Railway Sleepers?