my self i am raghu working as tech.. in my college the
maximum demand is 211 kva presently we are using 12kva
capacitors the target power factor is .95 so what capacity
of capacitor banks should i install
Answer Posted / kumar
what is your present power factor then only we can find it
Is This Answer Correct ? | 5 Yes | 0 No |
Post New Answer View All Answers
Discuss the effect of sudden loading of an induction motor
two way ckt diagram can be drawn by how many ways? give diagram
What is the role of Dedicated earthing in UPS System?
how to estimate wiring ins roughing ins. and boxes
is the value of inductance depends upon the evalue of thitha in doubly excited machine?
If i have two 3000 kW motors and the whole facility requires a 10 MVA transformer. What would be better installing two 5 MVA transformers(one for 1 motor ) or just a single 10 MVA transformer for both of them. Give reasons for your answer.
im working in one private compeny in gujarat. i was complet diploma electric in 2010 from gujarat technical board. now i want electric supervisor licence in gujarat but i dont't know when i apply? plz give me address of the licence dippartment office in gujarat. gandhinagar
what is the effect of higher value of GD???
What is the pro & con of having 11kv & 33kv incoming, and what is the adv & disadv. of converting from 11kv to 33kv.
how invertor convert the dc into ac give brif detail
how can we design robots
What is the role of feedback in a closed loop control system?
what should be the acceptrd value of winding resistance for 2.5MVA transformer
What id difference between power and energy?
Please clarify, 1. Is it required to lay two runs of GI wire along with Armoured LT cable if it is laid between one big mains (63Amps TPN SDF) to small main (32A TPN SDF) with proper glanding termination? 2. If the armoured cable with proper glanding is laid from DB to CNC machine, is it required to run two runs of body earthing to the Machine from DB? 3.If the armoured cable with proper glanding is laid from Substation to Hangar, distance is approx. 100 mtrs, is it required to do earthing at shop area though the primary termination at substation is earthed through gland.