Answer Posted / aditya parakh
You can create purchasing info records for different
procurement types as follows:
Standard, Subcontracting, Pipeline, Consignment You use this
component if you wish to store information on a vendor and a
material as master data at purchasing organization or plant
level.
Standard
-------------
A standard info record contains information for standard
purchase orders.
The info records can be created for materials and services
with and without master records.
Subcontracting
-------------------
A subcontractor info record contains ordering information
for subcontract orders.
For example, if you subcontract the assembly of a component,
the subcontractor info record would include the vendor's
(subcontractor's) price for assembling the component.
Pipeline
-------------
A pipeline info record contains information on a vendor's
commodity that is supplied through a pipeline or pipes
(oil or water) or by similar means (electricity through the
mains).
The info record contains the vendor's price for the
consumption of such commodities by the buyer
("pipeline withdrawals"). You can store withdrawal/usage
prices for different validity periods.
Consignment
-----------------
A consignment info record contains information on a material
that vendors keep available at their own cost on the
orderer's premises.
The info record contains the vendor's price for withdrawals
by the orderer from consignment stock.
As in the case of the pipeline info record, you can store
prices for different validity periods.
Is This Answer Correct ? | 12 Yes | 1 No |
Post New Answer View All Answers
Can we create pr with reference to another purchase order?
Mention what are the major purchasing tables? List the transaction codes for them?
What is a 'batch' in the context of 'batch management'?
what is cbp? What is the difference between cbp and mrp?
What data does the information record contain?
How you can link a document to a vendor master record?
How to delete a batch?
What are some of the options available to transfer materials from one plant to another?
Can we have release procedure without classification for a po?
Can we change the layout of miro screen? Does it require enhancement?
What is a mrp area?
Pls guide me to choose to MM cource (SAP) in Mumbai or N. Mumbai
Explain the 'valuation area' concept in mm?
What is the subcontracting cycle?
hello guys, could you tell me the few difficult tickets that you have solved in SAP MM??