What are the various load combination in Limit state method?
Answer Posted / g. siva rami reddy
There are nearly 17 considerable load combinations. 1) 1.5
(DL+LL) 2) 1.5 (DL+WL X Positve) 3) 1.5 (DL+WL X Negative)
4) 1.5 (DL+WL Z Positve) 5) 1.5 (DL+WL Z Negative) 6) 1.5
(DL+Seismic X Positive)7) 1.5 (DL+Seismic X Negative) 8) 1.5
(DL+Seismic Z Positive)9) 1.5 (DL+Seismic Z Negative) 10)
1.2 (DL+LL+WL X Pstve) 11) 1.2 (DL+LL+WL X Ngtve)12)1.2
(DL+LL+WL Z Pstve) 13) 1.2 (DL+LL+WL Z Ngtve)14)1.2
(DL+LL+Seismic X PStve)15) 1.2 (DL+LL+Seismic X Ngtve)16)
1.2 (DL+LL+Seismic Z PStve)17) 1.2 (DL+LL+Seismic ZNgtve)
but we will consider seismic in two direction only then
load combination will reduced to 13.
| Is This Answer Correct ? | 5 Yes | 2 No |
Post New Answer View All Answers
what is escalation?how it is done?
How to calculate dry of volume of concrete constant?How it comes 1.54 or 1.57
What is .Dwg?
what is Brest Wall?
what are the values of compressieve strenght?
difference between trapezoidal and pedestal footing and how the load acts on that
please, what is the required bar for a column of 6mx6m the dept is 405mmx300mm,its an axially loaded ?
what will be the total emoluments for deputy surveyor in APPSC in the payband of ( 9460-27600). please give me the detailed information step wise?
HOW MANY BAGS OF CEMEMT USED IN PER M2 OF PARTITION WALL
What are the responsibilities of a construction manager?
explain the rale of the government in the construction industry
What is construction mitigation management?
how to calculate quantity of cement,sand & aggregate for u.c.r / r.r masonry in cm 1:6
what is the use if we fixed butterfly ties in column and masonry work joint?....where we have to fix(distance)..
1) a)to prepare mortar for bricklaying how much amount of water should be added for its maximum strength and workability(to avoid cracks which results, when high quantity of water is added)?is their a formula or ratio? b) suppose we want to make 1:3 mortar,what is the best way to measure cement ,sand and water and how? c)time before which freshly prepared mortar should be used? d)proper way to mix and make mortar? e)when should curing start after laying bricks and for how long?and also how many hours per day? f)what is shear wall (please in terms of layman lol) bookish definisions are confusing.... g) and last,acc to codes what are max no. of course that should be laid in a day.