How can a screen field that has changed since the last
output operation be detected?
Answer Posted / sunit
by attaching an MDT attribute with the field
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What is the difference between copybooks and subprocedures in as400?
How many program bind in one module....
What is file identifier where we can use?
what is *place and *auto keyword in prtf ?plz explain
what is a rpg?
1. If there are two programs using same file and 2 users are using the file at the same time and what can be done to allow them both to access? 2. How can remove lock from the file for accessing it by both users?
How Chain operation copies the record's data to the input buffer for the program?
if there is a module object , how to find the program object for this module object.Assume the module object name and program object name is not same.
Please tell me how to read the records from a file with load an array of size with error conditions(The logic answer for this question is ARR is array of 99 elements Z-ADD 0 IDX *LOVAL SETLL FILE READ FILE 99 *IN99 DOWEQ *OFF IDX ANDLT 99 ADD 1 IDX MOVE FIELD ARR,IDX READ FILE 99 ENDDO).So,Please give me the complete of this code.
what is the rpg system?
are there any useful c runtime apis that I can call from rpg iv?
Q:HI friends accually ihave one problem plesase let me know the alternate code of this code. Related field description of code: Add a field, CALvsPRD, "Calendar Day Starts Before/After Production Day" to the parameter set WRKORDER which accepts values 'A' or 'B' o B = Calendar Day Starts Before Production Day o A = Calendar Day Starts After Production Day o Any other value indicates the production and calendar dates are always the same. code: Automatic Execution Of *INZSR Subroutine /Z01 * retrieves WRKORDER field values. /Z01 * Calculate default Production Date and return it to caller. /Z01 * Production date defaults to system date /Z01 C Eval P@Pdate = %DATE() /Z01 * unless Calendar date starts Before PDN(production) date and /Z01 * system time is before PDN Start Time then /Z01 * PDN date is yesterday. /Z01 C If W@CALvsPRD = 'B' and /Z01 C %TIME() < %TIME (W@Strtime) /Z01 C Eval P@Pdate -= %Day(1) /Z01 * unless Calendar date starts After PDN date and /Z01 * system time is *GE PDN(production) Start Time then /Z01 * PDN date is tomorrow. /Z01 C ElseIf W@CALvsPRD = 'A' and W@Strtime > *Zero and /Z01 C %TIME() >= %TIME (W@STrtime) /Z01 C Eval P@Pdate += %Day(1) /Z01 C EndIf /Z01 C Eval *InLr = *On
how do you use commitment control in rpg?
what is the use of sflnxtchg?
can you debug ile rpg program using isdb?