Answer Posted / ramir v. agustin
Just comensurate to my Job position and present economy
Is This Answer Correct ? | 2 Yes | 1 No |
Post New Answer View All Answers
how to find ssm in foundation?
How are freeway bridges built?
Minimum concrete cover in slabs, columns, beams, foundation and other st?
what is the code provision for acceptance of fineness modulus range for fine aggregates in design mix
why is the column design?
What things you need to take care of before building a kitchen island?
how we check the thickness and line of ceiling plaster.
Design a cantilever type retaining wall to retain sand for 4m above the ground. The sand fall slopes at the rate of 1 vertical to 2 horizontal. The weight of sand is 18000 N/m3, the angle of repose being 30. The safe bearing capacity of the soil is 200 kn/m2 at 1/25m below the ground level. Use m 15 concrete mix.
What is alternate bid?
What is Gsb tollens ?
The foundations are placed below ground level, to increase?
What are the methods in tiles flooring ? What are the methods in brick work? What are the methods in plastering ? What are the methods in wall tiling?
which steel is better for residential building tmt steel or hysd steel
what is the meaning of 40/20 src
Why should you show Client/Engineer activities clearly on the project plan?