Answer Posted / sjtbehera
What is PCO. if it is releatd to civil, i think it is PCC (
plain cement concrete) or either it is releated to General
Knowledge PCO ( public Call Office)
| Is This Answer Correct ? | 11 Yes | 3 No |
Post New Answer View All Answers
afe or not
What is Time period of a building and its relation with frequency ?
One plate (women civil worker lifting Plate - Satti) sand measures how many cubic feet?
What is the difference between 53 grade and 43 grade cement
can u plz send me ntpc placement papers(civil engineering) at mohit_verma21@yahoo.com
how to preaper for interview wat they asked in interview give me idea
What expenses counted in contingencies and how much it is in related to built-up area of the building.
Which Types Of Bricks ?
what does the track parameter mean in staad.pro?
what is escalation?how it is done?
how much st. steel is required for staging of concourse slab of a elevated metro station allowing through traffic .
Can any body help me out by telling hoe swelling pressure test of soil is carried out ? some body told me the procedure & formula (change in length /116.3*100%) but still i am confused ? pls help.
how much of the strength comes from post-production curing
What is the difference between shear and tensile strength?
In reclamation works what are the importance of geotextiles and sand?