Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

WHAT IS THE difference betwwen LT CABLE AND CONTROL CABLE

Answer Posted / gunasekaran

LT cables ratings are interms of few KVA t0 several hundred
KVA but control cables from few VA to hundred VA

Is This Answer Correct ?    1 Yes 5 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

WHY THE RATINGS OF THE TRANSFORMER IS 33KV WHY NOT OTHER???

2392


What will be result if we connect LT votage to the terminal of HT motor?

2148


What are the symptoms of a bad PG card of a drive (inverter) esp. of Yaskawa Ac Drives (inverters) G7 ?

2055


If I want to replace a 26KW Slip ring Motor with a Squirrel Cage motor & Drive (for a Hoist Application). How can I approximate the Motor & Drive HP required in new Setup.

2273


How many types of instrument cables are there?

1098


Why does increasing the magnetic flux in the main field of a d.c motor cause the armature current to reduce??

2044


What is the drawback of static coefficients?

1623


Differentiate between voltage and current feedback in amplifiers?

1119


sugest any typical project ?

1824


What is meant by harmonic distortion?

1119


A commercial Building is designed with 14th floor levels with indoor substation of three phase transformer with rated capacity of 1000 Kva.The transformer delivered 65% of its rated capacity at 0.67 power factor lagging.Because of low power factor, the power customer was penalized and certain cost was charged accordingly based on every point percentage lower than 85%.This situation may repeatedly happen on the succeding energy bills of power customer.The power customer is desired to improve its historical power factor of 0.67 lagging and no further penalty be impose by the local power company on the next bill. Q: Identify the appropriate solution you want to offer to Client?.Justify SCIENTIFICALLY and MATHEMATICALLY the principles behind the solution.

1800


What is the loss of transformer of 220kv/11kv, 63/80 MVA and 18.05% impedance

2001


what is the difference between switchgear and circuit breakers and is there any difference between outdoor and indoor switchgear and circuit breakers , and how would you differentiate between switch yard and substation and grid station . thanks

2226


my diploma certificate in my higher education college

1615


I Want randstand placement papers