Answer Posted / asif
yes we have just 2 bypass auto and mannual when we use the
word ups it means auto matically but when we use dc charger
we can oprate mannually
| Is This Answer Correct ? | 1 Yes | 1 No |
Post New Answer View All Answers
Is it posible to instal one more SMDB from the existing SMDB and is it practical.
Can u Explain about the electronic trivector meter and the use of data converters in them?
hi this is hema, r there any books in particular for the preparation of the APPSC-A.E.E(electrical), if so please mail me the names ... thank u .
Please send 110 kv sb station full single line drawing(sld)
The slip during plugging operation is given by= A 1-s B 2+s C 1+s D 2-s
what mean by analog ,digital,numerical meters and relays? say the example?
Name one of major transformer company in KSA ?
what are the interview question asked in wind mill about electrical
What are linear and non-linear systems?
Define closed loop control system.
substation+ plc system
is IS says that neutral should be brought to switch box. and this one is a recomended practice
What is the formula for calculating no-load current?
explain why core loss of a transformer is almost constant under different load conditions when connected across a constant voltage and constant frequency.
technically, what is the reason behind starting the motor star the delta connection .. and what other ways to do this rather than using " star-delta transformer"