Answer Posted / bala guru nathan.v
The ARC chute model is the one way of extinguish ,it
seperates(widen) the bunch of flame ,the seperated flame
can be easily quenched by air ,if you understand the
function you should see the ACB Arch Chute once.
| Is This Answer Correct ? | 8 Yes | 0 No |
Post New Answer View All Answers
We have drive feeding an output contactor for a 5000 hp motor @ 5kV application. The motor FLA is 629amps x 1.25% service factor = 786.25 amps The cable that we current have in place between the drive and the output contactor is 350kcmil- MV-105 (parallel cables). Per the NEC table 310.60 (C) (69). This show the cable ampacity is at 615 amps per cable for a rating of 1230 amps. We have derated the cable for the cable tray and the multiple cables application and our calculations show that after the correction factor factor we are at 922amps. 1230 amps x .75% correction factor factor = 922.5 amps. The customer is driving us to then use another safety factor of .25% off of the already derated cable. Can you please provide a longhand calculation for your solution on this application?
what does vector group Dyn11 tell us? also tell me how will u differentiate between phase lead and phase lag thru this vector group
What is the effect of solar radiation on the design of an Isolated Phase Busduct?
Explain difference between stand by earth fault and residual earth fault protection?
What is the relation between frequency and motor rpm?
How does HT work & Voltage required?
what will happen if earth of 33 kv cable (earthed system) is not connected to earthing pit?
How it can worked plc based electrical system And which type of software using.
State kirchoff voltage law?
How to design the earth grid for lightning protection in an industry
What is resolution of a measurement?
why occ characteristics of generator is also called as magnatization characteristics ?
All the socket in a room become very hot, the Wall was also became very hot and the earth conductor also became live, what in your view might be the possible causes?
why ct's&pt'S out put called as burden,why compelsary short ckt the secondary of ct's while removing the burden?
As per the Anchor capstan motor specification, full load current is 200A. starting current is 1750 A and acceleration time is less than 8 seconds. Please guide for selection of cable size.