Answer Posted / rahul
It is rigid like waterfall model, i.e. adjusting scope is less. It is not well suited for projects where there is frequent change in the requirements.
Here, no early prototype can be designed as testing goes parallely with development.
| Is This Answer Correct ? | 3 Yes | 1 No |
Post New Answer View All Answers
What are the differences between stlc and sdlc?
What is the procedure of manual testing?
How will you determine when to stop testing?
could anyone explain application testing in sequence order i don't have any experience in that
What is the difference between baseline and traceability matrix?
how will the test plan is pepared in ur organisation>?
Hi to all, im vaibhav i joined a MNC as a tester and i got a banking (HSBC) project can any one tell me as a fresher what kind of strategy i sholud use to perform better. thanx
If anybody from banglore having the real time exp in manual testing with 3+ yrs exp and looking for change send your profile to vinodhanandhan@gmail.com
How to explain the Insurance project in the interview?
In manual testing, what are stubs and drivers?
what is prototyping model,RAD model V model, spiral model?????
A form has four mandatory fields to be entered before you submit. How many numbers of test cases are required to verify this? And what are they?
Once automated, what are the types of functionality provides the highest Return On Investment (ROI) to the company?
hi what are the test cases for web application..i need these example..please..mail me at mina_ims@yahoo.com
Password is having 6 digit alphanumeric then what are the possible input conditions?