Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

What is the benefit of making a cantiliver proped.?

Answer Posted / sachinprakash05

to give load at one point

Is This Answer Correct ?    5 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

If we don't have drawing for Excavation of building,At what rule we will go for excavation and how much depth will go for a villa?

1773


How much material is required for constructing a 2 Lane 2Km rigid pavement road

2257


Dear Sir, I work in hydro project. I want to hire Scorpio/ Bolero on monthly basis. But how can i justified its amount (Hourly basic). Please solve my problem

2802


important question on stones

2073


What are the strongest shapes in building?

1190


the water is flowing through a velocity of 1.5m/s in a pipe of length 2500m and dia 500mm. at the end of pipe a valve is provided. find rise in pressure 1. if the valve is closed in 5 seconds. 2. if the valve is closed instantaneously. take value of c = 1460m/s, pipe to be rigid and bulk modulus of water - 19.692x10' n/sqcm

2420


Why Should Curing Not Be Done By Ponding And Polythene Sheets?

1352


why we create short columns under grade slab?

2358


How to Know that veriation acceptable in CPWD Work Of 1:6 Cement Mortor Received Lab test report.

2379


50 acre of land to be reclaimed for an average height of 2.5 mt. Dredging area is 500mx200m size. what is the dredging depth required to reclaim the area?

2010


how ratio is calculated for any grade of concrete. for e.g. sppose M20 requires(x;y:z) quantity of cememt sand and aggregate.

2141


what is features of a typ-ical modern air-conditioning installation?

1994


How and where are aqueducts built?

1252


How much cement is require in one sqft area in a G+3 residential construction.

2183


what is the ingredient value of 40mm and 20mm aggregates?

2050