Answer Posted / jinchandramule
COOIS:Production order information system.
Gives you the Detailed information of the production order
like,
ORD NUMBER,MATERIAL,ORDER TYPE,PLANT,START DATE,ORDER QTY,
ORDER STATUS.
Which is used for the information purpose,in Shop Floor
control.
| Is This Answer Correct ? | 6 Yes | 1 No |
Post New Answer View All Answers
What are the parameters are there in Order type or in dependent para. config?
suppose we have sales order-40, PIR-25,warehouse stock-40, so when we run mrp,what quantity the system displays with MTO & MTS. How?
What is Production scheduling Profile and use of it?
Mention how mrp (material requirement planning) types are classified?
What is the difference between “planned consumption” and “unplanned consumption”? Can safety stock calculation be done on either of these?
What are the key fields in MRP views?
What happens to planned after it has been converted into production order ?
What is the role of an administrator in pa?
What is Backflush, the places where the backflush is used?
Overlapping and splitting, where do you assign?
What is the difference between the fixing type 1, 2, 3, 4?
Mention what is the production process in sap?
Integration between PP and PM module.
We are trying to create purchase requisition from mrp run. We have material, info record, source list, demand in place. Mrp is always creating plan order. Why?
What is opening period?