Answer Posted / jinchandramule
1:Material Master - MM01
2: BOM creation - CS01
3: Work Center creation - CR01
4: Route creation -CA01
5: PIR Generation -MD61
6: MRP Run - for Total Planning - MD01
for Single-Item, Multi-Level - MD02
7: Evaluation through MRP list and Stock requirement list -
MRP List -MD05,
Stock Requirements List - MD04
8: Conversion of Planned order to Production order - With a
planned order -CO40
With material - CO01
9: Order management - Change >With material CO02
10: Confirmations- For order CO15
For Operation -For time ticket -CO11N
11: Goods issue - MB1A--261Movement type
12: Goods receipt - For Order MB31
13: TECO or Close Order- from Prod. Order Header menu.
14:Ko88 Order settlement
15:kkbc_ord costing report
this is the pp cycle
| Is This Answer Correct ? | 28 Yes | 0 No |
Post New Answer View All Answers
What is Planning time Fence?
What is the standard info set?
What is a ‘work center’ in pp?
Explain schedule margin key
Mention what are the types of master views for production and planning?
What is Inspection Points?
what is the major ticket in your experience
What does the use of ms70 followed by mcec get you?
What is opening period?
define variable cost
What is golive actually? What is the role of a functional consultant in golive actually?
Explain what happens to plan after it has been converted into production order?
What is planning file entry
Difference between Manual reorder point and Automatic reorder point.
How requirements( pir,sles order, customer requirement) are reduced after they are produced?