In which context do you use bills of material?
[ ] Material Requirements Planning
[ ] Execute Production
[ ] Goods Movements (to Help Data Entry)
[ ] Product Costing
[ ] Development/Engineering/Design
[ ] Documentation
[ ] Others
Answer Posted / jinchandra
In following context we use bills of material?
[1 ] Material Requirements Planning
[2 ] Execute Production
[ 4] Goods Movements (to Help Data Entry)
[3 ] Product Costing
[5 ] Development/Engineering/Design
[ 6] Documentation
[7 ] Others
| Is This Answer Correct ? | 13 Yes | 3 No |
Post New Answer View All Answers
What are the steps of production execution process?
What is MRP group?
How is indian slab and us slab?
What is a ‘bom’?
What are the three 'mrp procedures'?
What is mrp controller means?
Can mrp be carried out for one particular level of a bom ( level code : 0001/0002 etc)?
How requirements( pir,sles order, customer requirement) are reduced after they are produced?
What is the difference between indian and us payroll?
What is Backflush, the places where the backflush is used?
How you get the ticket?
Standard mrp steps
Mention what are the t-codes for creating, changing and summarizing bom?
What is golive actually? What is the role of a functional consultant in golive actually?
We have two storage locations are ‘0001’ and ‘0600’. Default storage location in process order is always ‘0001’ what determines this default location?