In which context do you use bills of material?
[ ] Material Requirements Planning
[ ] Execute Production
[ ] Goods Movements (to Help Data Entry)
[ ] Product Costing
[ ] Development/Engineering/Design
[ ] Documentation
[ ] Others
Answer Posted / jinchandra
In following context we use bills of material?
[1 ] Material Requirements Planning
[2 ] Execute Production
[ 4] Goods Movements (to Help Data Entry)
[3 ] Product Costing
[5 ] Development/Engineering/Design
[ 6] Documentation
[7 ] Others
| Is This Answer Correct ? | 13 Yes | 3 No |
Post New Answer View All Answers
Difference between base unit of measure, production unit, order unit
Explain Flexible Planning procedure or How many levels of Flexible planning.
Difference between Item categories or what is variable size item or non stock item.
Have you used Pull list or back flushing in REM?
Differentiate ‘variant bom’ from ‘multiple bom’?
How to create PRT master record?
Two or three Production Orders are there for the same day, and goods are not sufficient and then how to proceed?
What is planning file entry
Which MRP types you have used?
What do you mean by pooled capacity?
What do you do to run MRP for just one MRP Controller?
define variable cost
How system calculate the actual cost?
What are the ‘bom categories’ supported by sap?
Standard mrp steps