which grade of concrete is the strongest?
M20,M25,M30,M35 or M40?
Answer Posted / nagori salim
M - Mix.
20,30,.. etc.- Characteristic Strength of concrete after 28
days of curing.
Higher the number, higher is the strength of concrete
always.
| Is This Answer Correct ? | 15 Yes | 1 No |
Post New Answer View All Answers
With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr
types of piles detail,
Hollow block masonry in cement mortar 1:4, 40×20×20cms in superstructure take 10sqm.I want calculation of brick sand
why should we use 20mm graded metal only in vrcc?why we shouldnot use 40mm metal?
For plate load test why we are applying pressure 3 times the proposed allowable bearing pressure? Is there any supporting standards for this?
List out the potential risk factors for workers on the construction site?
how to read the drawings to find the quantity of steel in a storm water manhole or any other structure?
Define Who designed the city of Washington DC?
hi every body..i have applied for RRB section engineers CIVIL.i wanna prepare for that,so can any one suggest me some books and where can i get the syllabus for this..i would be vry greatful if any one can help in this regard
How do you convert wind speed into force?
What is rate of concrete surface rendering work per sqm
What is the difference between EPC,DBOOT and BOOT.
If we have the center line of the Finnish road level and we want to know what level of pay would have offset the Lhs and Rhus RHS 1,2.5,5 1,2.5,5 m.
What is meant by dimensioning?
pls give me some basic informations in construction of a structure?