Answer Posted / nagori salim
Shear Key is provided at the bottom of Earth Retaining
structures to avoid shear failure.
Steel schedule is a tabular format showing steel details
such as shape of bar, length of each bar & total required
length, dia of bar, wt/m & total weight.
| Is This Answer Correct ? | 51 Yes | 2 No |
Post New Answer View All Answers
CAST EFFECTIVE WATER SUMP CONSTRUCTION DETAIL
calculate the quantity of cement ,sand,bars and aggregate used for 28*4 ft with 4 inch (125mm) thick
What are the skills required to become an architect?
How to calculate thickness of MAT slab & Reinforcement? The dimention of under ground water reservoir is 80'X14'X 12 ft
what is the criteria for the finalisation of pavement thickness in road project?
What is Rankine Cycle?
Questions related to civil.engg in company
Dear Sir I Mahesh C. Bhamre have already given a Exam for Superintendent Officer / Public relation Officer Exam Dharmday Aaukta held at Nashik on Date 29/08/2010. My seat no was 5040247. and my cell no is 9822677994. and my mail Id is - mahesh.bhamre@rediffmail.com So can you pl send me details of result of respective exams. Thanking you in Anticipation.
all technical question
How to calculate chejja reinforcement
how to tie 10 legged stirrups
What is the outturn of Ceiling plastering
how much cement and sand required for 1cum rr masonry
Explain why concrete barriers have curved surface profiles?
What Are The Different Type Of Slump Test Indications?