Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

1.DIFFERENCE BETWEEN NOMINAL MIX AND DESIGN MIX?
2.WHAT IS MEANT BY STRUCTURAL DESIGN?
3.IN STAAD WHY WE RELEASE MOMENT TO A MEMBER?
4.ON WHAT BASIS PARTIAL FACTOR OF SAFETY ARE DECIDE?FROM
THE LOAD COMBINATION?
5.WHY WE PROVIDE EXTRA BAR & DEVELOPEMENT LENGTH AT TOP?
6.FULL FORM OF SPT & SMB?
7.WHAT IS MEANT BY ITP IN A CONSTRUCTION PROJECT?
8.WHAT IS LEAST COUNT OF THEODOLITE SURVEY?
9.WHAT ARE THE CAUSES OF FAILURE OF FOUNDATIONS AND
REMEDIAL MEASURES?
10.WHAT ARE THE VALUES OF COMPRESSIVE STRENGTH?
11.STEEL CALCULATION FOR FOOTING,BEAM & SLAB?
12.WHAT IS MEANT BY GANTRY GIRDER?
13.IN SITE HOW WE CAN IDENTIFY THE ONE WAY, TWO WAY SLAB?
14.DIFFERENCE BETWEEN ANCHORAGE LENGTH & DEVELOPEMENT
LENGTH?
15.BEARING CAPACITY OF STEEL SHUTTERING?LOAD CARRYING FOR
SHUTTERING?

Answer Posted / edakkathlath

1.Nominal mix are as just specified in is codes. Design mix
ratio is fixed by considering the load of the structure and
the quality of materials .nominal mix eg:M10 to M25
Design Mix eg: M30 onwards
2.structural design mean the details of reinforcement and
the mix of concreting
5. some time we have to provide extra bars as per the design
for carrying the load .Generally in simply supported beam at
mid span it is provided on the bottom and end at top

Is This Answer Correct ?    14 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

in levelling operation the first site on any change point is back site the second site on any change point is fore site the line commenses with fore sight & closes with backsight the line comensses with back sight & closes with fore sigh

2261


In which code the the maximum height of concrete casting has been explained

2856


How do you calculate reinforcement weight of steel?

1103


What are the different methods for drawing an arc?

1233


material used for mendrel use to bend epoxy coated rebar

2159


what is meaning of inverted beam.is it way to provide double mat in slab one at bottom and another at topif we go for provision of inverted beam. shall we construct structure with out plinth beam for us we have to construct small bus shelter

2489


what will be the cost of thickness of 125mmor rcc measurement of 52x33.75 feet

1591


What are the basic use of runners and standards of pipelines?

1223


length where bent up is made in slab of bridge from one end

1921


What are the causes of building collapse?

1159


how to calculate reinforcment in staircase cranked beam?

2802


What is the strength of 1:6:12 mix?

3066


what is pouring and explain

2344


How many kilo-newtons equals 1000 kilogram?

1145


how many types of survey and what are levelling instrument?

2140