RCC colums of 15"X9" each, roof height 10.5'ft, total
pillars 12 nons. Span between pillar to pillar is 14/20/20
length wise and 17/14 width wise. Total Slab area 2400 sft
and plinth area is 1900 sft. beams are 12"X12". kindly
calculate load factor per sqft.
Answer Posted / sujit
calculating load factor
incase of astructure some live load and dead load is
calculating
As per IS code - take live load-4.0 kn/Sqm
terrace finish- 1.5 kn/sqm
floor finish - 1.0kn/sqm
water proofing- 2.0 kn/sqm
----------------------------
total load-8.5 kn/sqm
i conver all ft ad inch to mt and mm
dead load of column or its own weight-
.38x.228x25x12=25.992kn/m 25kn/m recc wight
beam weight- .304x.304x25x15.732x3=109.041
- .304x.304x25x29.5x4=272.62
slab weght- 222.22x.100x25= 555
------------------------------------------------------
total weight= 962.653kn/sqm
total dead load+ live load=962.653+8.5 = 971.153kn/sqm
so per sqm load factor = 971.153 kn /sqm
you can easily convert it per sqft
Is This Answer Correct ? | 32 Yes | 4 No |
Post New Answer View All Answers
What is 1/8 on the architect ruler denotes?
What is the difference between Rock And Murrum. How to claim that excavated material is not a murrum but rock.
Define What happens to Load at yielding ?
sir when can we expect the AEE results and when will be the interviews sheduled please guide us in this regard thanking you
If we are providing concrete joint in every 10m with water stopper in water tank wall then is it necessary to cut the steel at joint section?
What expenses counted in contingencies and how much it is in related to built-up area of the building.
I am called for interview from north east power plant .so, I need some interview question which may help me.
hi every body..i have applied for RRB section engineers CIVIL.i wanna prepare for that,so can any one suggest me some books and where can i get the syllabus for this..i would be vry greatful if any one can help in this regard
For The preparation of goverment examination Which book i will prefer and by which way i will do the preparation for exam.
Explain major difference between auto level and dumpy level?
what is meant by csr in foundation? what is sbc?what is meant by contour line?
What is aggregate?
as per is code, what is the minimum content of opc and ppc cement for rcc structure
Sir, Iam Applied in rrb for the posts of Junior Engineer.I want to know about the or question previews to study well.Pl send it to shukla_varun1985@yahoo.com.
Permissible wastage of cement as per IS code ? In which IS code I get it?