I need BHEL Engineer Trainee written test papers in
Mechanical stream.
Answer Posted / utham
i applied BHEL MECHANICAL ENGINEER TRAINEE POST, IF ANY ONE
HAVING BHEL PREVIOUS PAPERS PLEASE PASS IT AND ALSO WHICH
BOOKS I HAVE TO FOLLOW TELL ME
| Is This Answer Correct ? | 11 Yes | 6 No |
Post New Answer View All Answers
Please brief me about Ball-screw.
give the sample format of boq plumbing materials
Why the centrifugal pump is called high discharge pump?
which quality steel is better for molasses storage tank? & why? IS 2062 GR A OR IS 2062 GR B
Greetings This question is about hydraulics and I request an expert to answer it. A simple hydraulic machine is made up of two heads, a larger one with a larger force inside a wider pipe and a smaller one with a smaller force inside a smaller pipe in width as in the second picture on this link: http://science.howstuffworks.com/hydraulic1.htm The question is this: what happens if the smaller head and the smaller force doesn’t exist but the smaller pipe is high enough to take all the liquid? For example the larger head is 1.00 sqr metre and can go down 1.00m under a weight of 100.00kg. The cross sectional area of the smaller pipe is 0.001 sqr metre. Now when the larger head goes down 1.00m, how high the liquid from the wider pipe can go into the smaller pipe of the cross sectional area of 0.001 sqr metre? Regards
Explain how can I see where pipes are behind the wall?
Dear all, Will some one help me in this issue please? We are entering the Zero Stock Component in Maintenance Order, and we make a Check when the order creator is going to release system will appear Error, until he will not delete that zero stock components from the Maintenance order. but right now what the order creator is not releasing the order but he is going to save order, when's he save the order without release system will generate Reservation in the back ground, which should not happen for Zero Stock Components ? I need the way which we are doing in MB21, Reservation creation by thru Cost Center / WBS Element. At present if you run MB21 and you are going to issue the material system will not allow to generate the reservation if there are zero stock components in the list. please guide me for this issue ? Note : Simple what I need is I don't want to create any reservation thru maintenance order for the Zero Stock Components. Regards, Abdul Mujeeb
Hi where can i get catia v5 r16 help files
Dear Friends I want to previous 5-10 years technical and non tech. question paper of section engineer (mechanical)of RRB and also tell me how should I prepare for S.E. and which books will help me for technical,aptitude,resoning.plz send me at bkcs.bkcs@rediffmail.com
on which basis safety valves are set with particular pressures?
Dear Sir, I am Shariq Sami. I joined BHEL as a Supervisor Trainee in May 2009 on diploma basis, right now i am an assistant Engineer and posted at Noida. I have completed my bachelor of engineering from Jamia Millia Islami, New Delhi.I am Planning to appear for "BHEL ET" exam this year. I want to know,is there any previous year question papers will be available like we have for GATE exams or you feel it is no need? Can you please guide me? Kind Ragards M.S Sami, Contact No. 9891090742, 9250250988, 0120-2545796
Where does Parallel flow heat exchanger use?
DAE Mechanical engineering interview questions
hi,i am sekar.i am prepareing Assistant Motor Vehicle Inspector in TN.Transport ,if any one have previous year model pares or some questions,pls send me at gpsekar2007@gmail.com.
Explain the term torque