Trapezoidal footing length = 2m , B=1.7m D=0.5m and d-
0.15m. Can anybody help and calculate quantity of concrete
by explaining all formulas involved.
Answer Posted / rakesh suthar
h/3(area of bottom + area of top+ under root area of
bottom * area of top)
Is This Answer Correct ? | 155 Yes | 39 No |
Post New Answer View All Answers
in the earthquqke the profile of water on dam is parabolic or not
What is the difference between Rock And Murrum. How to claim that excavated material is not a murrum but rock.
How much material is required for constructing a 2 Lane 2Km rigid pavement road
"how can we find the approximate quantity of materials using in a building or total Expenditure in percentage for rough estimate after known the construction area(sqm)".please if you know something about that please post the answer.
what is Brick crushing strength(PSI)?
1) What is meant by C-soil in geotechnical Engineering? 2) What is Eve board? 3) What will happen when heat is applied to cement? 4) what do you understand by the lateral dimention ?
Maximum cement content in 1cum for RCC and PSC? (please give IS,IRC referance?
Please design 12.5m long dubbly beam
manhole height is 1500 mm and width of brickwork is 230 mm dia of manhole covering is 560 mm brick masonry 1:4 horizontal length is 1500 mm and plaster 12 mm thick on both side 1:3. how to estimate the quantity of brickwork with mortar cement and sand for manhole chamber.
How to find out kg per Sft ?
what are the layers of the national and heir aprox thickness??
que.is ideal size of bricnk use in india,joint size of mortar in massinary ,how many bricks used in 1cum.how to test at site.what is the possition of marka used in bricks?
afe or not
I want to know the relevant IS codes of practice which deals with different testings of cement-sand mortar (nominal mix)that is being normally used for brick work or plaster work in the construction work.
Who built the sears tower?