Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

What is the full form of AND,OR and other logic gates

Answer Posted / subra

AND gate means serise connection that means this AND that
close we can get out put. OR gate means parallel connection
that means this OR that close we can get out put.

Is This Answer Correct ?    9 Yes 9 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

sir,in our plant we r using SATEC PM172E power reading meeters in HT panel side it is monitoring the MB data smart viewer(sever).but last one week we did not get readings inthe server only available in meeter.tell me how communicate meter and server. and also what steps we take for checking.

2178


What Is Connection APFC Panel In Compony.

1399


I have 2500KVA transformer delta/star,13.8KV/380V provided with LV 4000A breaker. Already I have 2300KW motor feeder with a full load 90%. Is it possible to connect another 1600A from that breaker? If so how the calculation is done?

3761


what is earth-fault?when it occurs? to check where it occurs what type of test should we do?

1934


What is the significance of integral controller and derivative controller in a pid controller?

1103


What is signal flow graph?

1053


I'm looking for a mnaual set for a Teradyne J750. Softcopy would be preferred but I'll take what I can get.

2147


In Air circuit breaker LSIG protection unit is used. Without fault in cables (2 runs 3Cx150Sq.mm Copper, 1Kv grade, XPLE armored cable IR value is more than 550Mohm @ 500V Megger) and load section Long time Overcurrent protection is triggers and trips the unit. We changed LSIG protection with new factory tested unit. Even then fault is persisting. Please suggest the possible causes

741


How can ou verify the size of conductor 50Sq.mm ACSR

1887


What is effect of over voltage and under voltage on ACB

1883


What is the ratio of true power to apparent power in an ac circuit?

1088


how to convert lv line to hv line and viseversa, any losses will occur during this process

2018


What are the Formula of computing Back up Time of 500kVA UPS with 4 Battery Banks, each bank composed of 43 pcs of Batteries 12V150Ah. How to compute the Back up Time of UPS? We have also 3X500kVA UPS running in Parallel same composition as I write above.

1292


what about SAP/MRP regarding manufacturing of electric motors and all drives?

1971


send me any model test paper of clerical post of state bank of india.......

1786