How I can reread the physical file in CL program once the
end of file reached in same CL program.
Answer Posted / parkpark
NOTHING WORKS~!
| Is This Answer Correct ? | 2 Yes | 2 No |
Post New Answer View All Answers
how do I declare a minor?
How to define data area in RPG program? In which scenario multi occurrence DS is use in AS400?
Please tell me how to read the records from a file with load an array of size with error conditions(The logic answer for this question is ARR is array of 99 elements Z-ADD 0 IDX *LOVAL SETLL FILE READ FILE 99 *IN99 DOWEQ *OFF IDX ANDLT 99 ADD 1 IDX MOVE FIELD ARR,IDX READ FILE 99 ENDDO).So,Please give me the complete of this code.
When we have a file with Duplicate records and I want to read the unique record from the file. For example a file containing Emp Name as 'Ram' and there are 3 entries of it. So how to read a unique record from File?
What is the difference between copybooks and subprocedures in as400?
Assume 2 users are using the same file and first user updates some record in the file. Will the 2nd user will be able to see the updated record or not?
What is the purpose of record level identifier?
Q:Hi all,i want accurate answer with code using in built functions.please sent me code as soon as posible. I have program nmed PGM1 which '' RETRIEVE Current production date''should correctly default the production date for the user who is issuing raw materials to the manufacturing.The production date can be different from the celendra date. However, the program does not make the correct adjustment for all manufacturing plants. there is a parameter which determines the production start time e.g. 07:00 if the system time precedes this,the program subtracts one from the celendra day.This work fine when the celendar day starts after production day as it does in England,the system should be adding one to the celendar day during the overlap. unfortunately the program was desined to assumed the celendar day always starts before the production day. Change required in the program: Change the PROGRAM PGM1 to use the new parrameter to decide whether to add or subtract 1 from the celendar day when determining the production date.
What is the difference between iter and do?
1. What is bound-by-call and bound-by-reference? 2. Where and why is *Nomain used? 3. What are the difficulties faced by programmers when using service programs? 4. Explain the different ways of parsing and compiling XML in iSeries.
can I touch the array during treatments?
1. If there are two programs using same file and 2 users are using the file at the same time and what can be done to allow them both to access? 2. How can remove lock from the file for accessing it by both users?
what do you mean by an input subfile, what are the keywords required?
if there is a module object , how to find the program object for this module object.Assume the module object name and program object name is not same.
what is the procedure and explain about real time scenario.