why we are doing post tensioning in beams and slabs.
it is economical compare to rcc? how?
Answer Posted / vikram jain
Dear Friend,
It is very economical as compared to RCC.
1.) Early Post-Tensioning allows the formwork to be stripped and re-deployed quickly. Significant saving on material, up to 30% on concrete alone with longer spans, fewer columns & thinner slabs producing lighter overall structure and reducing foundation cost.
2.) Joint free ground slabs up to 10000 mイ and true & level floor – ideal for automated ware housing and super markets.
3.) A facility to span over poor ground conditions with full resistance to mining subsidence.
3.) Water proof floors to eliminate unsightly staining of concrete fascias. Thinner slabs give more head room.
4.) Flexibility- Internal layout flexibility is greatly increased, making it much easier to place or reposition partitions with formwork stripping and redeploying quickly and with less steel & concrete construction work is faster than R.C.C. construction.
5.) Spans up to 50% longer than those using RCC can be constructed with fewer support columns.
6.) Offers resistance to cracking and water seepage due to limited deflection and highly compressive characteristics of prestressed concrete structure.
7.) In Post Tensioned slabs, slab is always tested for stresses that are supposed to be come on slab.
8.) Thinner Slabs – post tensioned slabs of thin concrete plates may be used to reduce storey height in multistory buildings.
| Is This Answer Correct ? | 6 Yes | 0 No |
Post New Answer View All Answers
what is c4x light weight cement blocks
Civil engineering material testing Standard results
Why concrete barriers have curved surface profiles?
How to decide/consider the grade of bitumen for dbm.
In the different classes or grades of concrete, what is the difference between C20, M20 B20. what are the letters C, M, and B stands for.
Is there any course for billing available in Mumbai? If yes then please mail me the details..
how much cost of single coat 20mm thick plastering per sqre meter
what is the minimum cement content for M20 & M25 as per is code -456(2000).
I have an span length 16 ft c/c
why building got air crack? if it get in one particular are what is means?
What out turn civil works
What is the minimum size of the particles of silt soil?
What are the methods of measurement? Describe it shortly
hi guys what happens if you are absent for a supplymentry exam?
How much area, in square meters, will one liter of paint cover if it is brushed out to uniform thickness of 100 microns?