Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

what is the difference between synchronization and paralleling?

Answer Posted / gunasekaran

synchronising means gen is connected to grid.
parallel means two gen are connected between them

Is This Answer Correct ?    6 Yes 16 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Define newton's law of viscosity.

1212


what is difference between earthingpits,earthing grid & earthing mess?

2509


How many VSC based HVDC are there in India and the world

2235


Is there any reason that we get shock on touching phase wire because the earth is at neutral potential? Is there any reason that the earth is at neutral potential because the neutral is earthed in apower station

2013


Define thermal resistance in the context of power amplifier.

1127


What are the applications of the electric motors?

1072


Why front mounted CT polarities are always towards breaker?

2024


WHAT IS THE SIGNIFICANCE OF VECTOR GROUPS IN TRANSFORMER? WHAT WILL BE EFFECT WHEN PHASE DISPLACEMENT CHANGES IN TRANSFORMER?WHAT IS THE NEED TO BE PHASE SHIFT CHANGE BETWEEN THE PRIMARY AND SECONDARY WINDING

1786


A 7 storey building has a floor area of 35,000sq.ft on each storey. On the ground floor 11KV electrical sub-station is to be erected. A load of 3kw for every 400sq.ft (p.f is 0.8) is proposed for each floor. fire pump 7.5hp, water pump 5hp, lift 2 nos, each 10hp and 20shop load of each shop is 5kw. calculate a. load each floor b. total load of building c. L.T feeders for aech floor and from transformer to main. d. distribution diagram e. capacity of sub-station/capacitor bank f. line diagram

2816


Difference between RCCB, RCBO and ELMCB.

4084


What is inductance?

1193


what is the earth current,reverse power,electrical trip generator short circuit,low voltage, high voltage please discribe me

2111


What is Anemometer used to measure?

1125


What is a slack bus?

1147


State angle criterion.

1116