Answer Posted / santhoshi
Rendezvous point should only be placed in the action section
which is used to make all the users who arrive first to wait
for the remaining users to come to that point. If all users
comes to the same point then the execution starts. This
helps in getting correct load test report. Multiple
Rendezvous points can be placed.
| Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
What are the vuser components in loadrunner?
What are the information contain by script windows for each script in the list?
How do you identify which protocol to use for any application?
When the loadrunner controller open the winrunner file then what is the location of the winner configuration file?
What is difference between manual scenario and goal oriented scenario?
how to add 100 for dynamic(correlate value) value
What is the threshold level for think time and how can be this changed?
What are the challenges that you will face to script the step “select all” and then “delete” for any mail account?
What is the advantage of running vuser as a process than a thread?
While scripting you created correlation rules for automatic correlation. If you want to share the correlation rules with your team member working on the same application so that he/she can use the same on his workstation, how will you do that?
What are the different components of loadrunner?
When the rendezvous point is insert?
How load runner interacts with the application?
What is a correlation? Explain the difference between automatic correlation and manual correlation?
What is the loadrunner end transaction and its syntax?