sir please send me previous year questions of jspl through
which i could prepare myself fpr the test.
Answer Posted / ramgopal
Sir, please send me the question of previous years' GETs
(mechanical) from which an idea of the written exam can be
made.
Thank you.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
How to use earthing on shipments.
What are capacitive,resistive,inductive surge absorbation? What is ferranti surge absorber? What is lagrangian cost? What is Px operator?
I am inpecting a 10kVA UPS what tests should i do and should i observe?
how can we select the appropriate VCB ?
what are the preventive maintanance actions taken for air circuit breaker? please answer me
Pls explan the OLR setting in VCB at HT yard
we have a rewind motor of 2Hp,2800Rpm, 220Volt AC. how can we choose the running capacitor for this motor, any formula for that?
I am having a 1500 KVA transformer whose secondary current is 2086A and my connected load is 1000 KVA, I am having 400 KVAR APFCR for PF improvement what ratio of CT should i install in LT EB Bus to get optimum PF improvement?
if you are in a software company,then why do you want to come in a core company like sail, ntpc(where lots of trouble like tension but you have a good life in a it company) ?
in my industry we are using 3 step up transformers for induction heaters..i.e 415/580v and other are 11/440v.in power consumption does a step trnsformer makes any difference compared to step up?? plz explain
Whether power factor should be high or low? Why?
What is meant by stator? What is meant by rotor?
HOW TO CALCULATE THE HEAT AND LOAD OF LT-SUBSTATION WHICH CONTAINS 2*1MVA TRANSFORMERS,LT SWITCH BOARD,MLDB,ACB,BUSBAR,ETC...?
Please clarify, 1. Is it required to lay two runs of GI wire along with Armoured LT cable if it is laid between one big mains (63Amps TPN SDF) to small main (32A TPN SDF) with proper glanding termination? 2. If the armoured cable with proper glanding is laid from DB to CNC machine, is it required to run two runs of body earthing to the Machine from DB? 3.If the armoured cable with proper glanding is laid from Substation to Hangar, distance is approx. 100 mtrs, is it required to do earthing at shop area though the primary termination at substation is earthed through gland.
Can Anyone suggest the Standards (IEC or IS) for selecting copper current density?