Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

How the main bus bar rating of 400kV switchyard with one
and half breaker scheme is calculated.

Answer Posted / jayasudha

Consider installed capacity + 10 % margin

Is This Answer Correct ?    5 Yes 6 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

If one tertiary phase i.e. R,Y or B is earthed of a loaded type tertiary delta connected (Without load)of a power auto transformer, what is its advantage/disadvantage?

2127


what happen if the supply is given to the stator of the 3phase induction motor with out assembling the rotor ?

1979


how can i determine the KVA/MVA rating of transformer precisely?? is there any standard test?????

2437


List of equipments required foe industrial repair lab.

1935


What is current divider rule (cdr)?

1389


Describe the control mechanism of missile launcher???

2017


Vaccum circuit breaker

1457


how does the rotating m.m.f is produced in the 3-phase induction motor and how the poles are created in 3-phase induction motor ?

2693


WHAT IS SPEC OF CLEANROOM MOTOR AND LIGHT FITTINGS?

2359


in ACB breaker requireding 3200Amps. buscoupler getting OFF mode and again it reset and getting normal position give me a required answer?

2385


What is meant by reactance voltage?

1195


SUTIABLE FOR ohm's law super conductor

1993


I WANT YHE TECHNICAL AND ELECTRICAL SPECIFICATIONS OF 2x4MW 11KV 2x10MW 11KV 2x25MW 11KV 2x100MW 11KV HYDEL POWER PLANT i.e PROTECTION SYSTEM,MONITORING,CONTROL SYSTEM,GENERATION,SYNCHRONISATION,METERING PLEASE SEND THE DETAILS TO MY MAIL ID SPRAVEEN_222@YAHOO.CO.IN

2145


PLS SEND THE RRB CHENNAI MODEL QUESTION PAPER my email id is ganesan98655@rediffmail.com

2066


Earth bits close or open. Which is correct