what is difference bettween High level documents and low
level documents wht is covered in it ? when does tester
uses this ie wht level of testing?
Answer Posted / siva
HLD:
High Level Deign is the overall system design --
covering the system architecture and database design. It
describes the relation between various modules and
functions of the system. data flow, flow charts and data
structures are covered under HLD.Acceptance
Testing is used in this design process.
LLD:
Low Level Design is like detailing the HLD. It
defines the actual logic for each and every component of
the system. Class diagrams with all the methods and
relation between classes comes under LLD. Programs specs
are covered under LLD.Unit and Integration Testing is used
in this design process.
| Is This Answer Correct ? | 23 Yes | 0 No |
Post New Answer View All Answers
What is data matrix? What is the use of it?
whats the reason to display the password(not in encrypted form) in the script in load runner but not in QTP?
hi all I have an overall experience of 12 years working in an EDP setup(worked in a manufacturing setup in a German MNC). On my request, I was relieved from my duties in Sep 06 for maternity reasons. However I would like to pursue a career in a software organization as a manual tester. I obtained my proficiency certificate in Software Testing from STAG SOFTWARE LIMITED 2 months ago i.e in May and would now like to continue working in this field. However I am unable to find a job until now. If anybody knows of a opening at bangalore, kindly let me know.
Can anybody give whole test cases for banking module.it should include from start to end .that will help me more.to do study.it should contain account,deposite,withdraw,fd,atm modules.?please try to give me??
What are the typical risks that you identify during test planning and their mitigation plan and Contengency plan.
According to RBI rule how much money can be transferred through online banking at one time...?
what is the critical defect in telecom domain?help me out from this prob its very urgent
Can you please explain me how to do testing of an E-insurance project end to end process..
What is the negative testing and example
Why is it impossible to test a program completely?
Why would we not include these?
Should testing be done only after the build and execution phases are complete?
Can automation testing replace manual testing?
is it not possible to automate full project??what r the parts in project that cant be automated(tht has to be done manually)?
How will u decide test data to see that evey feature is thoroughly tested