Answer Posted / jaggarao
we can not say in valume wise because it is a design mix.it
is always in by weight.
| Is This Answer Correct ? | 10 Yes | 16 No |
Post New Answer View All Answers
what is the water cement ratio? how to calculate it? list the wt. of constructions materials including concrete both ordinary and light wt. concrete
When was the first motorway built in england?
How to make a c++ program that converts any base to base 10?
What is the value of live load that should be incorporated in design of locker room and cash vault room while designing a building for commercial bank?
Before casting a basement roof slab which is connected with retaining wall surcharge load (i.e. sand or earth filling) outside the retaining wall is prohibited because of––
How to calculate dry of volume of concrete constant?How it comes 1.54 or 1.57
Formula of mid span bar
"how can we find the approximate quantity of materials using in a building or total Expenditure in percentage for rough estimate after known the construction area(sqm)".please if you know something about that please post the answer.
In jack arch floor, the rise is kept?
How many square meter can a worker/labor demolish a structure per day?
what are the types of design? which type of method is used at what type of design & why?
What are the important hardware systems used for cad?
How you read 5x3x1 #4 @ 20" 0/C in steel structure?
why is M30 grade Concrete use for Foothing & Column M50
how we check the thickness and line of ceiling plaster.