who much should be the lap length in reinfocement
Answer Posted / ppl
This answer is dependent on the diameter of the bar, the
strength of the concrete, the use (type of construction),
the code you're using, and the standards in the location you
wish to build it. Find the code you need for your area and
type of construction, make sure there aren't any superseding
local standards, and then look up all the rules. Many codes
(like the international building code) have half a dozen or
more.
| Is This Answer Correct ? | 0 Yes | 3 No |
Post New Answer View All Answers
How to calculate or what is the process of calculation for making 1Metre squre area by AAC Blok which quantity of Cement, Sand & Chips are to be required?
if we use 1.25 bag of cement 3 pharma metal and 2 pharma crush sand what is the strenghtexpected for RCC column
what s the standrd size of pvc fittings ,like elbow, bend,tee etc ? please explain with figure ?
how to compute slab reinforcements on step by step procedures??
Cement consumption of one cubic meter of aerocon blocks masonry?
My daily concrete volume of M25 concrete is 1st day= 25 Cum 2nd Day = 45 Cum 3rd Day = 55 Cum 4th Day = 22 Cum 5th Day =72 Cum 7th Day = 49 Cum. What will be acceptance criteria of concrete considering as per is 456 cl.15 and table 11 (cl 16.1 and 16.3).
Bearing capacity of soil determined as per ASTM is to design the foundation size.what is the importance of EV1/EV2 value as per DIN .My consultant ask me to test the the soil as per din to find out this ratio to assess the compacted strength of soil ,,?? is it meaning full ??
To pcc 11 ft x 24 ft .How many bags of cement, sand and aggregate required? And for roofing how many cgi sheets required?
What is the quantity of cement used for stone pitching work of 100sqm 225mm thick and cement mortar of 1:6? And how?
Tell me about triple point of water.
How many Sft of Level Plaster per Kg
is there any codal provision for soil cousion over the Hume pipe of Dia 1.2 m.
What Are The Different Type Of Slump Test Indications?
how to calculate freeboard in under ground water tank and technical details
How many days should curing of plastering, brick work and concrete