Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

what r the main parts of central chiller plant in Air
conditioner ? explain the function of each?

Answer Posted / sulthan

compressor,condenser,expension valve, evaporator coils

Is This Answer Correct ?    48 Yes 9 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

USE OF 8 WAY PAN ASSEMBLY

1963


What is open delta Xformer? It's adavntages & Use?

2232


A 7 storey building has a floor area of 35,000sq.ft on each storey. On the ground floor 11KV electrical sub-station is to be erected. A load of 3kw for every 400sq.ft (p.f is 0.8) is proposed for each floor. fire pump 7.5hp, water pump 5hp, lift 2 nos, each 10hp and 20shop load of each shop is 5kw. calculate a. load each floor b. total load of building c. L.T feeders for aech floor and from transformer to main. d. distribution diagram e. capacity of sub-station/capacitor bank f. line diagram

2816


What is the working mechanism of OLTC in Power Transformers????

4326


what is the effect of un-synchronized power.

2061


Is the installation of the filter cloths necessary before spreading the gravels at the transformer yards?

1943


Define sensitivity?

1099


why different series of vfds (like allenbradley)are used in industry ?

2301


33kv substation lay out details & line to line & line to earth measurements

2621


I am getting above 60 V as open delta voltage against single phase unit ICT at tertiary delta formed and ICT getting trippped on NDR. ICT tested and found in order. PTs provided on tertiary are tested and in order. what may be the reason?

1887


i am gng to visa interview this july i have 4 backlogs gre 1010,toefl 75,pls give me the tips pls pls

2155


what is difference between 5A and 100A CT constructional wise and operation?

3570


what is auto re-closer?

2635


How we can defined theecopper cable size if we know the aluminium cable size?

1876


why does make gain margin and phase margin on same plot.?

2118