what are the types of cables?

Answer Posted / rahul sutar

1)Armoured & unarmoured (copper/aluminium) as per
specification.
2)Flexible (2 core, 3core,4core, 10core, 12core, 16 core
etc)as per requirment avialable in market.

Is This Answer Correct ?    4 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

We have drive feeding an output contactor for a 5000 hp motor @ 5kV application. The motor FLA is 629amps x 1.25% service factor = 786.25 amps The cable that we current have in place between the drive and the output contactor is 350kcmil- MV-105 (parallel cables). Per the NEC table 310.60 (C) (69). This show the cable ampacity is at 615 amps per cable for a rating of 1230 amps. We have derated the cable for the cable tray and the multiple cables application and our calculations show that after the correction factor factor we are at 922amps. 1230 amps x .75% correction factor factor = 922.5 amps. The customer is driving us to then use another safety factor of .25% off of the already derated cable. Can you please provide a longhand calculation for your solution on this application?

1679


why u r living from presentaly working.

1980


What is the settings of distance protection relay in 400 kv line

1200


HAI SENT HPCL APTITUDE QUESTION PAPER, MY EMAIL ID IS angus_eee04@rediffmail.com,angus_eee04@yahoo.com

1720


How to decide no. of Step and Kvar for APFC Panel 40 kvar MD: 33.12 KVA Avg pf : 0.8540

678






Please clarify, 1. Is it required to lay two runs of GI wire along with Armoured LT cable if it is laid between one big mains (63Amps TPN SDF) to small main (32A TPN SDF) with proper glanding termination? 2. If the armoured cable with proper glanding is laid from DB to CNC machine, is it required to run two runs of body earthing to the Machine from DB? 3.If the armoured cable with proper glanding is laid from Substation to Hangar, distance is approx. 100 mtrs, is it required to do earthing at shop area though the primary termination at substation is earthed through gland.

1578


our factory is going under construction mean time transformer 1000 kva 2 nos &load break swithch 12 kv & 4 nos 750 kva 2 nos & 380 kva 2 nos generator to be errcted.how to arrange earth pits &how to earth connect & neutral pit how to calculate in earth bit size.

1673


what are the different sizes of U.G. cable & where these cabl;es are used according to voltage ..

1668


how is control wiring coding is done in a CRP panel ?

1550


How capacitor improves pf

1213


what is the illumination level required for child play area?

1622


Electrical 'C' license full abbreviation , and full form

1344


Why AC current leads voltage in capacitor and how?

1634


How to decide CT & PT ratings for a given transmission line carrying some rated voltage?

1894


why 1.7Uo for HV cable Hi pot test?IE standard why?

1885