Answer Posted / nikhil jain
Elapsed Time = Ramp up time + Duration
During Scheduling you define both these values and hence
can calculate. moreover you can see on top right pan in
controller during running scenarios.
| Is This Answer Correct ? | 4 Yes | 4 No |
Post New Answer View All Answers
How you develop the database vuser script?
How many vusers are required for load testing?
How does caching affect performance testing results?
In a web server, database and network are all working fine and now, where could be the problem?
What do you mean by path?
When loadrunner is used?
Difference b/w 9.1 and 9.5 Versions in LoadRunner?
What is the advantage of using loadrunner?
How can you test the global servers with using loadrunner
How to upload media use loadrunner? I record the script but it fail because the top of document is invalidation.How to solve the problem?Which one know the answer please tell me. Thanks!
What is report viewer?
What are the information contain by script windows for each script in the list?
What kind of problem we can face regarding hardware, software, network and memory bottleneck during the performance test?
What is protocol function?
What are monitors?