Answer Posted / nikhil jain
Elapsed Time = Ramp up time + Duration
During Scheduling you define both these values and hence
can calculate. moreover you can see on top right pan in
controller during running scenarios.
| Is This Answer Correct ? | 4 Yes | 4 No |
Post New Answer View All Answers
How can performance bottlenecks be identified?
How to schedule a scenario?
During the load test, what is the optimum setting for logs?
How you edit the script?
How to run a scenario?
What are all the components of loadrunner?
What is script list?
How can we develop the database vuser script?
What is a correlation? Explain the difference between automatic correlation and manual correlation?
What are monitors?
Where should you add a web_reg_save_param function to a script?
What are the element in the loadrunner controller?
What are different types of vuser logs which can be used while scripting and execution?
How many vusers are required for load testing?
Hi all, I am having an interview on LoadRunner (SAP Web Protocol). I am wondering if somebody can help me with some interview questions at a 2 yr Scriptor level. Thanks and all answers are much appreciated.